Investigating
Massive potholes
Reported via mobile in the Potholes / Highway Condition category anonymously at 20:44, Thursday 2 April 2026
Sent to North Northamptonshire Council less than a minute later. ref: 9233193.
There are several potholes on this stretch of road, really big and really deep. They are in both lanes and it is like driving an assault course trying to miss the potholes whilst avoiding oncoming traffic
Updates
-
If you believe that your concerns are an emergency (such as flooding, dangerous potholes/carriageway defects, highway obstructions, fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.
Posted by North Northamptonshire Council at 20:44, Thursday 2 April 2026
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by North Northamptonshire Council at 20:44, Thursday 2 April 2026
-
These potholes were reported on 2nd April, they have not been repaired. They cover the whole left had side of the road and are getting worse. It is now impossible to avoid them. I cannot believe you have resurfaced from Geddington to the Gt Oakley turn without repairing the road up to the Eurohub roundabout, that could then have been resurfaced at the same time. This needs to be upgraded, investigated and completed as soon as possible. It is now nearly 4 months since this was reported and this is not acceptable
Posted anonymously at 09:13, Saturday 25 July 2026
Only the original reporter may leave updates. If you made the original report please log in to leave an update.