You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Potholes

Reported via mobile in the Potholes / Highway Condition category anonymously at 07:55, Saturday 14 February 2026

Sent to North Northamptonshire Council less than a minute later. ref: 8916160.

Large potholes along the entire length of the road from the roundabout at Duck St all the way to the roundabout at Croyland Motors.

Updates

  • If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 07:55, Saturday 14 February 2026

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 07:55, Saturday 14 February 2026

  • Investigation: Completed (Defect Found) - Thank you for your enquiry. We will schedule a repair to be completed within 180 days (26 weeks), however we are currently operating for completion to be within 90 days. Please be assured that you will receive an update once repairs are concluded.

    Posted by North Northamptonshire Council at 13:51, Friday 20 February 2026

  • The condition of this road is worse than awful - potholes all along the stretch from the Duck St roundabout to the Croyland Motors roundabout. It is only a matter of time before someone is hurt as drivers swerve to avoid them. I appreciate there is a lot to do but why are some side roads being repaired when this main road through town isn’t?

    Posted anonymously at 08:54, Saturday 14 March 2026

  • Thank you for providing an update. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    Posted by North Northamptonshire Council at 08:54, Saturday 14 March 2026

  • The condition of this road is worse than awful - potholes all along the stretch from the Duck St roundabout to the Croyland Motors roundabout. It is only a matter of time before someone is hurt as drivers swerve to avoid them. I appreciate there is a lot to do but why are some side roads being repaired when this main road through town isn’t?

    Posted anonymously at 08:57, Saturday 14 March 2026
    Still open, via questionnaire

  • Investigation: Completed (Defect Found) - Thank you for your enquiry.

    We are currently managing a high number of requests, which has resulted in extended timescales for some works. Please be assured that your enquiry has received our full attention.
    At this stage, we are unable to provide an exact date or timescale for completion. However, we can confirm that our teams are aware of the outstanding work, which is included within our programme and will be delivered as soon as possible, in line with our network-wide prioritisation.

    Works are prioritised based on safety, risk, and overall impact across the network, and some issues may take longer to programme as a result. The location will continue to be monitored through our routine inspection regime.

    If the condition worsens or you believe it presents an immediate safety concern, please report this so it can be reassessed as a priority.
    We appreciate your patience and understanding while we manage this across the wider network.

    Posted by North Northamptonshire Council at 14:31, Friday 26 June 2026

Only the original reporter may leave updates. If you made the original report please log in to leave an update.