Drains completely blocked

Reported via desktop in the Blocked/Damaged category by Yvonne Blood at 10:22, Friday 6 February 2026

Sent to North Northamptonshire Council less than a minute later. ref: 8847899.

There is a drain next to the railway bridge which is covered in silt and cannot be seen. One drain is the side were the cottages are and the other drain is the side leading to the industrial estate. This problem was reported previously which reulted in all the drains being cleaned except the two that really need it. Can you please arrange for them to be done.

Updates

  • If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 10:22, Friday 6 February 2026

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 10:22, Friday 6 February 2026

  • The drains have been cleared by a resident as water was starting to cause problems under the bridge. However the soil around the drains is already covering them. It needs the drains tops clearing completely and the soil/silt around them taking away. If this is not done properly the problem with only get worse.

    Posted by Yvonne Blood at 19:31, Friday 6 March 2026
    Still open, via questionnaire

  • Still open, via questionnaire, 10:05, Saturday 4 April 2026

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We are currently managing a high number of requests, which has resulted in a slightly extended response time. Please be assured that your enquiry has received our full attention. We can confirm that we are aware of this defect and works have been scheduled to be completed by 27/10/26. You will receive an update once repairs are concluded.

    Posted by North Northamptonshire Council at 12:22, Wednesday 29 July 2026

  • Investigation: Completed (Defect Found), Defect Repair: Thank you for your enquiry. We can confirm that we are currently on site to start repairs in this location. Please be assured that you will receive an update once all repairs are concluded.

    State changed to: In progress

    Posted by North Northamptonshire Council at 13:10, Wednesday 30 September 2026

  • Investigation: Completed (Defect Found), Defect Repair: Completed

    State changed to: Fixed

    Posted by North Northamptonshire Council at 22:41, Thursday 1 October 2026

This report is now closed to updates from the public. You can make a new report in the same location.