Pothole in road on Barnard Close

Reported via mobile in the Potholes / Highway Condition category anonymously at 14:16, Friday 23 January 2026

Sent to North Northamptonshire Council less than a minute later. ref: 8752430.

The highway continues to deteriorate during the last two months with block paving sinking into the ground leaving unsafe potholes that risk trips and falls. The potholes are becoming larger now over 50mm in depth. Children often play in the street meaning that more vulnerable people are at risk.

Updates

  • If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 14:16, Friday 23 January 2026

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 14:17, Friday 23 January 2026

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We will schedule a repair to be completed within 180 days (26 weeks), however we are currently operating for completion to be within 90 days. Please be assured that you will receive an update once repairs are concluded.

    Posted by North Northamptonshire Council at 17:01, Friday 30 January 2026

  • The pot holes and road condition is getting deteriorating and needs urgent attention to prevent personal injury due to the trip hazmats risk. Please confirm when this will be repaired?

    Posted anonymously at 19:55, Tuesday 9 June 2026

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry.

    We are currently managing a high number of requests, which has resulted in extended timescales for some works. Please be assured that your enquiry has received our full attention.
    At this stage, we are unable to provide an exact date or timescale for completion. However, we can confirm that our teams are aware of the outstanding work, which is included within our programme and will be delivered as soon as possible, in line with our network-wide prioritisation.

    Works are prioritised based on safety, risk, and overall impact across the network, and some issues may take longer to programme as a result. The location will continue to be monitored through our routine inspection regime.

    If the condition worsens or you believe it presents an immediate safety concern, please report this so it can be reassessed as a priority.
    We appreciate your patience and understanding while we manage this across the wider network.

    Posted by North Northamptonshire Council at 12:51, Monday 15 June 2026

Only the original reporter may leave updates. If you made the original report please log in to leave an update.