You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here

Blocked drains

Reported via desktop in the Potholes / Highway Condition category anonymously at 13:49, Saturday 17 January 2026

Sent to North Northamptonshire Council less than a minute later. ref: 8708675.

The drain either side of the bridge is completely blocked causing water to collect. This is a continuous problem. The drains should be cleared on a regular basis but the work is never done.

Updates

  • If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 13:49, Saturday 17 January 2026

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 13:50, Saturday 17 January 2026

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We will schedule a repair to be completed within 28 days. Please be assured that you will receive an update once repairs are concluded.

    Posted by North Northamptonshire Council at 15:43, Friday 23 January 2026

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by North Northamptonshire Council at 09:55, Friday 30 January 2026

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by North Northamptonshire Council at 13:09, Monday 2 February 2026

  • The drains have got so bad that a resident has temporarily cleared them. They still need to be cleared further and the silt/mud taken away. If it left at site it just finishes back on top of the drains.

    Posted anonymously at 14:34, Saturday 14 February 2026
    Still open, via questionnaire

  • Investigation: Not Started (Defect Found), Defect Repair: Defect Found

    State changed to: Investigating

    Posted by North Northamptonshire Council at 12:35, Tuesday 24 February 2026

  • Investigation: Completed (Scheduled Maintenance), Defect Repair: Defect Found - Thank you for your enquiry. We are currently receiving a high volume of enquiries and can confirm that we are aware of this defect. Works will be scheduled to repair it, please be assured you will be notified once the repair has been completed.
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by North Northamptonshire Council at 14:41, Wednesday 4 March 2026

  • Drains still blocked and soil around causing problems

    Posted anonymously at 17:09, Saturday 14 March 2026
    Still open, via questionnaire

  • Still open, via questionnaire, 19:17, Saturday 11 April 2026

  • Investigation: Completed (Scheduled Maintenance), Defect Repair: Defect Found - Thank you for your enquiry. We can confirm that we have been made aware of this issue and a works order has been raised on a routine safety inspection. These works are due to be completed by 24/02/2027 Please be assured that you will receive an update once repairs are concluded.

    Posted by North Northamptonshire Council at 11:26, Wednesday 13 May 2026

Only the original reporter may leave updates. If you made the original report please log in to leave an update.