You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Potholes on North side of Newton Road

Reported via desktop in the Potholes / Highway Condition category anonymously at 14:38, Tuesday 11 February 2025

Sent to North Northamptonshire Council less than a minute later. ref: 7118805.

Multiple potholes on north side of Newton Road outside number 20. This stretch of road has been poor for some years with previous notifications resulting in small repairs that do not last. Proper large strip of road needs properly resurfacing to acceptable lasting standard.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 14:38, Tuesday 11 February 2025

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 14:38, Tuesday 11 February 2025

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We will schedule a repair to be completed within 26 weeks. Please be assured that you will receive an update once repairs are concluded.

    Posted by North Northamptonshire Council at 18:41, Tuesday 18 February 2025

  • The potholes reported a month ago are getting worse ! Not only are they likely to cause damage to vehicles but are a serious danger to cyclists - this is part of the National Cycling system. As a busy "Rat run " these pot holes are creating a lot of noise for residents as vehicles pass over them. A proper resurfacing is urgently required.

    Posted anonymously at 12:20, Friday 7 March 2025

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We will schedule a repair to be completed within 28 days. Please be assured that you will receive an update once repairs are concluded.

    Posted by North Northamptonshire Council at 19:16, Friday 14 March 2025

Only the original reporter may leave updates. If you made the original report please log in to leave an update.