You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Numerous potholes have formed in previous repairs, and and surface of recent previous repairs is crmbling away again

Reported via mobile in the Potholes / Highway Condition category anonymously at 09:25, Saturday 11 January 2025

Sent to North Northamptonshire Council less than a minute later. ref: 6964517.

Main Harborough Road was allowed to deteriorated into a dangerous state, and was eventually repaired in 2024. These repairs are now crumbling away and numerous potholes forming at the junction with Gold Street.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 09:25, Saturday 11 January 2025

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 09:25, Saturday 11 January 2025

  • Investigation: Completed (Duplicate) - Thank you for your enquiry. We can confirm that we have been made aware of this issue and a works order has been raised on a routine safety inspection. The expected completion date for these works will be 09/06/25

    State changed to: Duplicate

    Posted by North Northamptonshire Council at 07:15, Thursday 16 January 2025

This report is now closed to updates from the public. You can make a new report in the same location.