You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

RE: Verge rutting

Reported via mobile in the Verges - Damaged by Vehicles category by Craig Blacha at 08:47, Sat 7 December 2024

Sent to North Northamptonshire Council less than a minute later. ref: 6830041.

Highways Safety Inspection Manual 6.1 Verge Rutting

Are pedestrians likely to cross at the location ? A/ Yes on or near the location due to footpath presence and nearby zebra crossing.

Is there a footpath nearby? A/ Yes adjoining to popular walkway.

Is it a one off or constant rut? A/ This is a regular rut as there is a mudded dip and the grass has stopped growing back - the indication of damaged kerbstones would suggest heavy vehicles have hit this - kerb stones reported separately.

Are there single or numerous ruts? It is likely to continue as the kerbstones are damaged, this has also been reported on FMS and numerous tyre marks on the site aswell.

I look forward to your assessment on these findings

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 08:47, Sat 7 December 2024

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 08:47, Sat 7 December 2024

  • Investigation: Completed (Defect Found) - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised. The expected completion date for these works will be 12/06/25

    Posted by North Northamptonshire Council at 13:37, Mon 16 December 2024

Only the original reporter may leave updates. If you made the original report please log in to leave an update.