Pavement covered by topsoil

Reported via desktop in the Obstruction (Not Vegetation) category anonymously at 12:20, Thu 31 October 2024

Sent to North Northamptonshire Council less than a minute later. ref: 6679877.

Around 500 meters of pavement has been covered by topsoil and grass. This pavement was much wider when it was first constructed. Now this pavement is very narrow. Its been reported before and just 3 very small sections of around 10 meters were widened by about 100 mm. It would be good to unearth this pavement so that we can see the original width and people in wheelchairs or mobility scooters can use it once again. Its going to be necessary to clear and remove this topsoil. Its not going to cut it if this topsoil is simply piled up next to the pavement.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 12:20, Thu 31 October 2024

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 12:20, Thu 31 October 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the NNC Highways Inspection Manual, the defect meets the requirement for a Priority 4 repair. We will schedule a repair to be completed within 26 weeks. Our current average response time for a Priority 4 repair is 150 days.

    Posted by North Northamptonshire Council at 13:09, Mon 4 November 2024

  • Investigation: Ongoing (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the photo/s and we can confirm that in accordance with the NNC Highways Inspection Manual, the defect meets the requirement for a Priority 4 repair. We will schedule a repair to be completed within 26 weeks. Our current average response time for a Priority 4 repair is 150 days.

    Posted by North Northamptonshire Council at 13:47, Mon 4 November 2024

  • Thankyou , Its going to be important to unearth this pavement and remove the topsoil. What typically happens is the topsoil is tipped to one side so that it can run back onto the pavement. This then helps create more work in the future.

    Looking at some historic photos , it looks like this pavement has been covered over for many many years. Its probably going to be worth investigation other areas to see if there has been a general lack of maintenance trend.

    Just one more thing. The word fault doesn't describe the situation very well. What we have here is a simple lack of maintenance.

    Posted anonymously at 14:24, Mon 4 November 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the photo/s and we can confirm that in accordance with the NNC Highways Inspection Manual, the defect meets the requirement for a Priority 4 repair. We will schedule a repair to be completed within 26 weeks. Our current average response time for a Priority 4 repair is 150 days.
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by North Northamptonshire Council at 10:33, Tue 5 November 2024

  • Just a photo to show the extent of the problem You can see there is a pavement but only half of it can be used. This was previously investigated and apparently all was in order. I first reported this during December 2023.

    In the last year , i have spent just over £ 3000 in council tax and it would be great if I started to see a return in this investment.

    If the average household is paying this type of money , you have to start wondering why we only have half a pavement.

    Posted anonymously at 09:35, Fri 15 November 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on 520455 and add updates. The expected completion date for these works will be 05/05/25

    Posted by North Northamptonshire Council at 12:45, Fri 15 November 2024

  • Still open, via questionnaire, 12:57, Thu 28 November 2024

  • Hi , Just checking on the update. I would also like to be included on how the grass and topsoil will be removed from this pavement. If the pavement isn’t going to be fully unearthed and the top soil removed from site then there is no point starting this job

    If this isn’t going to be done properly then the topsoil will simply wash back onto the pavement and the problem starts over. The actual method statement will be able to confirm if the top soil will be properly removed or not.

    Posted anonymously at 04:38, Thursday 5 June 2025

  • I also see that this report was removed from the map.Its not fixed and it should remain.I first reported the problem around one and a half years ago and it was reported as fixed after a half baked attempt was made at removing just a fraction of the top soil and grass. I had to report again and I see it’s also been removed from the map.

    Posted anonymously at 04:43, Thursday 5 June 2025

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on 520455 and add updates. The expected completion date for these works will be 05/05/25
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by North Northamptonshire Council at 13:19, Thursday 12 June 2025

  • So , your are saying:

    The expected completion date for these works will be 05/05/25

    Today , it’s 12 June 2025

    Are you saying that it’s complete and that I can go and take a look.

    Posted anonymously at 14:13, Thursday 12 June 2025

  • Investigation: Ongoing (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on 520455 and add updates. The expected completion date for these works will be 05/05/25
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by North Northamptonshire Council at 17:22, Wednesday 18 June 2025

  • Investigation: Completed (Duplicate), Defect Repair: Not Started - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on and 6679877 add updates.

    Posted by North Northamptonshire Council at 12:45, Friday 20 June 2025

  • Thankyou , can you give me more details on how people can follow this works order number 6679877.

    I would be very interested to see the detail on how all this top soil is going to be removed.

    Posted anonymously at 13:38, Friday 20 June 2025

  • Investigation: Completed (Duplicate), Defect Repair: Not Started - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on and 6679877 add updates.
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by North Northamptonshire Council at 05:59, Thursday 26 June 2025

  • Investigation: Completed (Duplicate), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by North Northamptonshire Council at 07:38, Thursday 3 July 2025

  • Investigation: Completed (Duplicate), Defect Repair: Ongoing

    State changed to: In progress

    Posted by North Northamptonshire Council at 09:07, Thursday 3 July 2025

  • Hi ,

    We seem to just go around in circles.

    Posted anonymously at 10:51, Thursday 3 July 2025

  • Investigation: Completed (Duplicate), Defect Repair: Ongoing - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on and 6679877 add updates.
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by North Northamptonshire Council at 14:36, Thursday 3 July 2025

  • Investigation: Completed (Duplicate), Defect Repair: Ongoing

    Posted by North Northamptonshire Council at 16:23, Thursday 3 July 2025

  • Investigation: Completed (Duplicate), Defect Repair: Work Completed

    State changed to: Fixed

    Posted by North Northamptonshire Council at 13:12, Friday 4 July 2025

This report is now closed to updates from the public. You can make a new report in the same location.