You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Damaged footpath

Reported via iOS in the Slabs - Uneven / Damaged / Cracked category anonymously at 07:27, Tue 15 October 2024

Sent to North Northamptonshire Council less than a minute later. ref: 6615539.

The footpath between Great Addington and Little Addington is in such a state of disrepair that it is becoming more frequent people are tripping up injuring themselves, having to walk on the road to pass others due to the path ‘shrinking’ due to the hedge side collapsing into the drain or hedgerow that it needs to be rebuilt to its original dimensions, if not at least fully re-covered. Previous repairs have simply killed weeds poking through and not addressed the actual problem.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 07:27, Tue 15 October 2024

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 07:27, Tue 15 October 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the NNC Highways Inspection Manual, the defect meets the requirement for a Priority 4 repair. We will schedule a repair to be completed within 26 weeks. Our current average response time for a Priority 4 repair is 136.8 days. will get fw weed sprayed then reinspect to assess the fw

    Posted by North Northamptonshire Council at 18:29, Mon 21 October 2024

  • Still open, via questionnaire, 15:12, Tue 12 November 2024

  • Still open, via questionnaire, 20:37, Tue 10 December 2024

  • Still open, via questionnaire, 17:43, Wednesday 8 January 2025

Only the original reporter may leave updates. If you made the original report please log in to leave an update.