Back to all reports

Drains blocked on toll bar road and flooding into ISlip Sports Field

Reported via desktop in the Blocked/Damaged category anonymously at 13:18, Tue 24 September 2024

Sent to North Northamptonshire Council less than a minute later. ref: 6509829.

This problem has been reported twice already, and we have two videos which i cannot upload showing rain water flowing over the top of the clear road drain at the top of the entrance to the Sports Field. The water pours down the carpark as a stream and runs onto the pitch at the bottom of the slope and probably into the flood tank which we have had to pay to be emptied three time in the last 6 months. This is also causing damage to the carpark surface and which has to be levelled again after heavy rain.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 13:18, Tue 24 September 2024

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 13:18, Tue 24 September 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the NNC Highways Inspection Manual, the defect meets the requirement for a Priority 3 repair. We will schedule a repair to be completed within 28 days. Our current average response time for a Priority 3 repair is 14.3 days.

    Posted by North Northamptonshire Council at 14:30, Tue 1 October 2024

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by North Northamptonshire Council at 07:04, Fri 25 October 2024

  • Investigation: Completed (Defect Found), Defect Repair: Work Completed

    State changed to: Fixed

    Posted by North Northamptonshire Council at 16:00, Fri 25 October 2024