Vegetation in the road - missed when you last visited

Reported via mobile in the Restricted Visibility / Overgrown / Overhanging category anonymously at 20:08, Fri 26 July 2024

Sent to North Northamptonshire Council less than a minute later. ref: 6281266.

When are you planning on returning to finish the job you started on Friday afternoon?

By just closing the request on your system without carrying out the work is wasting everybody’s time and effort.

Please deal with the issue properly and remove all shrubs from the road.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 20:08, Fri 26 July 2024

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 20:08, Fri 26 July 2024

  • This is a road. The road goes right up to the 12ft wall. I am not aware that trees growing out of the road surface is “normal”! I would have thought that the “fix” for this issue would be to remove the vegetation growing out of the road surface, remove all of the detritus collected at the base of the wall having been trapped by the growth of the trees, and as such preserve both the road and the wall, minimising the risk of future damage and claims should the wall become unstable? This light trim has not “fixed” the issue.

    Posted anonymously at 11:37, Sun 28 July 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the NNC Highways Inspection Manual, the vegetation meets the criteria for a Priority 3 response. We will schedule vegetation clearance to be completed within 28 days. Our current average response time for a Priority 3 is 24.6 days.

    Posted by North Northamptonshire Council at 07:12, Thu 1 August 2024

  • Investigation: Completed (Defect Found), Defect Repair: Rejected

    Posted by North Northamptonshire Council at 09:27, Fri 9 August 2024

  • Still open, via questionnaire, 20:45, Fri 23 August 2024

  • Why does this meet NCC criteria and work is confirmed to be carried out, and then the job is rejected a week later? Is the NCC Highways inspection manual available for the public to read?

    Posted anonymously at 17:14, Thu 29 August 2024

  • Investigation: Completed (Duplicate), Defect Repair: Rejected - Thank you for your enquiry. We can confirm that we have been made aware of this issue. A works order has been raised which you can follow on 497919 and add updates. The expected completion date for these works will be 09/09/24.

    Posted by North Northamptonshire Council at 13:34, Mon 2 September 2024

  • At what point will you actually turn up and carry out the task of removing the shrubs from the road. Who ever it is that is ‘trimming’ this obstruction is just being a jobsworth and doing the bare minimum to ‘tick the box’ to close out the task. On past performance this will remain on your to do list for many years to come.

    Great use of my council tax.

    Posted anonymously at 22:19, Fri 20 September 2024
    Still open, via questionnaire

  • Investigation: Completed (Duplicate), Defect Repair: Rejected - Thank you for your enquiry. We can confirm that we have been made aware of this issue and a works order has been raised on a routine safety inspection. The expected completion date for these works will be 23/10/24

    Posted by North Northamptonshire Council at 12:37, Wed 25 September 2024

  • Still open, via questionnaire, 22:34, Fri 18 October 2024

Only the original reporter may leave updates. If you made the original report please log in to leave an update.