Road surface splitting all down Spencer Parade drains dropped and surface tatmac crubmling

Reported via mobile in the Potholes / Highway Condition category anonymously at 21:10, Sun 7 July 2024

Sent to North Northamptonshire Council less than a minute later. ref: 6201369.

The road is rapidly deteriorating even patches on existing drains inadequate road surface cracking and crumbling full length of spencer parade dangerous for motorbikes and push bikes especially.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are an emergency (such as flooding, highway obstructions fallen trees), please call 0300 126 3000, Monday to Friday (9.00 to 17.00). Outside these hours, please call 01604 651074.

    Posted by North Northamptonshire Council at 21:10, Sun 7 July 2024

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 21:10, Sun 7 July 2024

  • Investigation: Ongoing - Works to be completed by 15th July
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by North Northamptonshire Council at 15:27, Fri 12 July 2024

  • The bottom end of Spencer parade was inspected and no parking cones left but the main problems at the end nearest the church have been ignored

    Posted anonymously at 14:45, Mon 5 August 2024
    Still open, via questionnaire

  • Thank you for providing an update. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    Posted by North Northamptonshire Council at 14:46, Mon 5 August 2024

  • Investigation: Completed (Temporary Repair Completed - A permanent repair will be carried out in the next 28 days.) - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and carried out an immediate temporary repair. In accordance with the NNC Highways Inspection Manual, a permanent repair will be completed within 28 days.

    State changed to: In progress

    Posted by North Northamptonshire Council at 14:32, Wed 7 August 2024

  • This is how slow our road repair system is over 7cm deep gouges in the road loose pot holes and the surveyor checked the wester side of the road patched one smaller hole but ignored the rest.

    Posted anonymously at 16:22, Mon 2 September 2024
    Still open, via questionnaire

  • Thank you for providing an update. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by North Northamptonshire Council at 16:22, Mon 2 September 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the NNC Highways Inspection Manual, the defect meets the requirement for a Priority 4 repair. We will schedule a repair to be completed within 26 weeks. Our current average response time for a Priority 4 repair is 126.2 days.

    Posted by North Northamptonshire Council at 07:20, Fri 6 September 2024

  • Still open, via questionnaire, 18:25, Mon 30 September 2024

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by North Northamptonshire Council at 07:19, Wednesday 5 March 2025

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by North Northamptonshire Council at 13:55, Friday 7 March 2025

  • Investigation: Completed (Defect Found), Defect Repair: Work Completed

    State changed to: Fixed

    Posted by North Northamptonshire Council at 10:08, Wednesday 12 March 2025

This report is now closed to updates from the public. You can make a new report in the same location.